Volume 1
Volume 2
- EIAR Ch 1 Introduction (671kb)
- EIAR Ch 2 Site Context & Development Description (9597kb)
- EIAR Ch 3 Planning Context (7314kb)
- EIAR Ch 4 Consideration of Alternatives (14880kb)
- EIAR Ch 5 Population and Health (8713kb)
- EIAR Ch 6 Biodiversity (8476kb)
- EIAR Ch 7 Land, Soils, Geology, Hydrogeology, and Utilities - 08052026 (11377kb)
- EIAR Ch 8 Hydrology (7220kb)
- EIAR Ch 9 Noise and Vibration (4936kb)
- EIAR Ch 10 Air Quality (11604kb)
- EIAR Ch 11 Climate (1637kb)
- EIAR Ch 12 Wind and Microclimate (4158kb)
- EIAR Ch 13 Landscape and Visual Impact Assessmnet (11605kb)
- EIAR Ch 14 Material Assets- Traffic and Transport (2785kb)
- EIAR Ch 15 Material Assets - Waste Management (601kb)
- EIAR Ch 16 Archaeology and Cultural Heritage docx (206kb)
- EIAR Ch 17 Architectural Built Heritage (5261kb)
- EIAR Ch 18 Risk of Major Accidents and or Disasters (338kb)
- EIAR Ch 19 Interactions (483kb)
- EIAR Ch 20 Summary of Mitigation Measures (948kb)
Volume 3
- EIAR Appendix 1.1 Site Layout Plan- Proposed Ground level (3118kb)
- EIAR Appendix 1.2 Expertise (121kb)
- EIAR Appendix 1.3 EIA Screening Report (1316kb)
- EIAR Appendix 2.1 Construction and Environmental Management Plan (2694kb)
- EIAR Appendix 2.2 Topographical Survey (1786kb)
- EIAR Appendix 6.1 Leg Framework and Policy Context (94kb)
- EIAR Appendix 6.2 Value of Ecological Resources (107kb)
- EIAR Appendix 6.3 Bat Survey Metadata (569kb)
- EIAR Appendix 6.4 Comparison Table (120kb)
- EIAR Appendix 6.5 Statitic Detector Date (156kb)
- EIAR Appendix 6.6 Woodland Management Plan (2073kb)
- EIAR Appendix 7.1 NRA TII Criteria (170kb)
- EIAR Appendix 8.1 NRA TII Criteria (117kb)
- EIAR Appendix 10.1 Operational AADT Numbers (177kb)
- EIAR Appendix 11.1 Carbon Calculation (211kb)
- EIAR Appendix 13.1 Verified Photomontages 1 of 8 (15334kb)
- EIAR Appendix 13.1 Verified Photomontages 2 of 8 (19554kb)
- EIAR Appendix 13.1 Verified Photomontages 3 of 8 (19118kb)
- EIAR Appendix 13.1 Verified Photomontages 4 of 8 (19125kb)
- EIAR Appendix 13.1 Verified Photomontages 5 of 8 (17406kb)
- EIAR Appendix 13.1 Verified Photomontages 6 of 8 (18358kb)
- EIAR Appendix 13.1 Verified Photomontages 7 of 8 (18553kb)
- EIAR Appendix 13.1 Verified Photomontages 8 of 8 (17703kb)
- EIAR Appendix 14.1 Traffic and Transport Assessment (16462kb)
- EIAR Appendix 15.1 Resource & Waste Managment Plan (9037kb)
- EIAR Appendix 15.2 Operational Waste Management Plan (11688kb)
- EIAR Appendix 16.1 Site Analysis Figures (2109kb)
- EIAR Appendix 17.1 Conservation Method Statement (605kb)